Framing and lumber

Lumber and framing takeoffs from your plans

Upload the plans, ask for framing and lumber, and get the package as a list you can check against the drawings and price from your own lumber list.

Start a free trialQuotes & Plan Takeoffs in depth
The takeoff's materials sheet, grouped by section, ready to export or put on a quote

How it works

  1. Upload the plan set and ask for framing and lumber.
  2. Add the job's rules: wall framing, stud spacing, sheathing, waste.
  3. Check each line against the sheet it came from.
  4. Price it from your lumber list and quote it, or export it.

The package, read from every sheet

Framing is spread across the plans: wall lengths on the floor plans, heights on the sections, joist and truss layouts on the framing and roof plans, headers in the notes. The takeoff reads them all and returns the package as lines (studs, plates, headers, sheathing, joists, trusses, beams, hardware where the plans show it), each with the sheets it came from.

Your framing rules, every time

Set the notes your estimators always apply ("exterior walls 2x6 at 16 inches", "double top plate", "sheathing 7/16 OSB") and the waste by section, once. Every takeoff reads them, and waste is added to the counted quantity in code, never guessed by the AI.

Priced from your lumber list

Lumber prices move every week, so the takeoff never invents one. Lines are matched to your price book or the lumber lists you upload to Product Brain, and a line with no match waits for you as "Needs price". When a newer price list lands, the newer price wins.

Common questions

How accurate is an AI takeoff?

Treat it as a fast first pass for an estimator to check, not a finished bid. Every line names the sheet it came from, lines the AI is less sure of are flagged for a second look, and you can check each one beside the drawing. You can count or measure on the drawing yourself, and a number you type is final.

Where do the prices come from?

From your own price book or the price lists you uploaded to Product Brain. The AI matches a line to one of your products; it never makes up a price. A line with no match reads "Needs price" until you fill it in.

What plans can I upload?

PDF plan sets and images, up to 30 files and 500 pages a run, 100 MB a file. Name the trades or the pages you want, or leave it blank to read everything, and add notes for the job before it starts.

Can I take off framing only and skip the rest?

Yes. Say "framing and lumber" (or name the pages) before the run starts and the takeoff reads for that trade only.

Related

Takeoffs for a lumber yard's estimating deskAI material takeoffs from PDF plansAsk your price books anything

Where the leads come from: building permits by city · Pricing