How to read a building permit for sales
What a building permit's status, class, project type and declared value tell a supplier or a trade, and what they don't.
Status: in review or issued
A permit in review has been applied for but not yet approved. It is the earliest public sign of a project, and the builder is often still choosing suppliers and trades. An issued permit has been approved and work can start; the window for early trades is open now and closing.
Permits that are cancelled, withdrawn or expired are not leads, and a good permit feed drops them.
Class: new build or alteration
The permit class says whether the work is new construction or a change to something that already stands, and whether it is residential or commercial. A new single-family home and a basement renovation can share a project type; the class is what tells them apart.
Cities file garages, secondary suites and basements under the house's type, so a feed that only filters by type will be full of renovations. Filter by class as well.
Project type
The type names the building: single-family dwelling, duplex, townhomes, low-rise condo, high-rise apartment, mixed use, commercial, industrial and so on. It decides who the project is for. A roofing contractor wants houses and townhomes; a curtain-wall supplier wants towers.
Declared value
The value on a permit is what the applicant declared as the cost of construction. It is useful for sorting big jobs from small ones, but it is the cost of the whole build, not what any one supplier or trade will be paid, and applicants estimate it differently. Treat it as a size, not a budget.
The builder, the owner and the applicant
Many permits name a builder or contractor; others name only the owner, or an applicant who is the architect or a permit expediter. The builder is usually the buyer. When only the owner is listed, a developer's name often leads to the builder they hire, and an architect who files for many builders is a relationship worth having.
Dates
The filed date is when the application reached the city; the issued date is when it was approved. The gap varies by city and project size, from days for a simple house to many months for a large building. For timing a sales call, the stage matters more than the date.