How to find construction leads in British Columbia

Where British Columbia building permits come from, how to turn them into a weekly list of builders to call, and what to look for before a project is lost to someone else.

Start with the building permit

Almost every project worth selling into in British Columbia starts with a building permit. A builder or owner applies to the municipality before work begins, and the application names the address, the kind of project, the declared construction value and, usually, who is building it. That makes the permit the earliest public record that a job exists, often months before a site sign goes up or a plan room lists it.

For a supplier or a trade, that head start is the lead. The builder has not picked a framer, a window supplier or a roofer yet, and the first rep to call with a relevant offer is the one who gets a quote request.

Where British Columbia permit data comes from

Building permits in British Columbia are issued by municipalities and regional districts. Vancouver publishes its issued permits on its open data portal, and many other cities in Metro Vancouver, on Vancouver Island and in the Okanagan post permit lists or monthly reports on their websites.

The catch is that every municipality publishes differently: different columns, different words for the same status, different update schedules, and many smaller towns publish nothing at all. Metro Vancouver alone is more than twenty municipalities, so following the region by hand means checking a different source for each one.

Turn permits into a weekly call list

A permit feed is only useful if it becomes a short list someone actually works. The routine that holds up:

  • Pull the week's new permits for the cities you serve, not the whole province.
  • Keep the project types you sell into. A window supplier wants houses, townhomes and condos; a pool builder wants none of them.
  • Look at the status. A permit still in review is the earliest window; an issued permit means work is close.
  • Group by builder. A builder with five permits this quarter is one relationship worth five jobs.
  • Call within the week. A permit is public, and the competitor who reads the same record will call too.

What separates a good lead from noise

Not every permit is a sale. Demolitions, pool permits and small alterations fill the feed and rarely buy what a building supply branch sells. Declared value helps, but it is the cost of the whole build, not what any one trade will spend. Timing matters more than size: a framer needs the job before the foundation is poured, a finishing trade months later.

The builders who file again and again are where the value is. A builder seen on three permits in a quarter will need the same products on the next three, and the rep who learns their schedule wins all of them.

British Columbia coverage in BuildMapper

BuildMapper reads permits across Greater Vancouver/Fraser Valley, Vancouver Island, Okanagan, Kootenay and Northern BC, including Vancouver, Surrey, Burnaby, Coquitlam, Kelowna, Victoria and Nanaimo. Each week's new permits land on a map with the builder, owner and contacts where the city publishes them, every project is scored for the trade or products you sell, and the builders you already work with are flagged when they file again.

Building permits in British Columbia, by city

Permits filed in the last 12 months.

Vancouver3,053Surrey902Burnaby751Kelowna607Richmond518Abbotsford513Delta423Coquitlam281Victoria301Langley (Township)235Chilliwack311Nanaimo259Langford191North Vancouver (District)242Kamloops221Nanaimo RD223West Vancouver229Maple Ridge191Prince George223North Vancouver138Mission143Vernon156Thompson Nicola136Comox Valley RD131Penticton162CRD (Capital Regional District)133Central Kootenay RD118New Westminster130West Kelowna122Cowichan Valley RD130Sunshine Coast RD121Campbell River116North Okanagan RD105Courtenay91Squamish102Okanagan Similkameen RD127Salmon Arm80Columbia Shuswap RD101Colwood63Central Okanagan RD60

Common questions

Are British Columbia building permits public?

Building permit applications and issued permits are public records in British Columbia, but each municipality decides how to publish them. Larger cities post them on open data portals; many smaller towns publish periodic reports or answer requests.

How early does a building permit show up?

Usually weeks to months before construction starts. A permit in review is the earliest record that a project exists; an issued permit means work is close.

Does a permit tell me who the builder is?

Often, but not always. Many cities record the builder or applicant on the permit; some record only the owner. Where the builder is missing, the owner or the designer is usually the way in.