Prime Design Solutions
Building permits filed by Prime Design Solutions over the last two years: where they are building, what they build, and how busy they have been. From municipal permit records; the latest filing was Nov 16, 2026.
Permits filed per month
Where they build
Permits in the last 24 months, by city.
- 34
- 2
What they build
Permits in the last 24 months, by project type.
- Commercial Building16
- Single Family Dwelling6
- Laneway House6
- Townhomes/Row Homes4
- Double Family Dwelling2
- Industrial Building2
Common questions
How many building permits has Prime Design Solutions filed?
Prime Design Solutions filed 36 building permits in the last 24 months, 18 of them in the last 12 months. The most recent was filed in November 2026.
Where is Prime Design Solutions building?
By permits filed in the last 24 months, Prime Design Solutions has been most active in Calgary (34), Edmonton (2).
What does Prime Design Solutions build?
Over the last 24 months, Prime Design Solutions' permits were mostly for Commercial Building (16), Single Family Dwelling (6), Laneway House (6). 12 were new buildings and 24 were alterations.
How can I see Prime Design Solutions' current projects?
BuildMapper shows every permit Prime Design Solutions files on a map, with the address, project details and contacts where the city publishes them, and can alert you when they file a new one.