J.Starr Engineering
Building permits filed by J.Starr Engineering over the last two years: where they are building, what they build, and how busy they have been. From municipal permit records; the latest filing was Apr 15, 2026.
Permits filed per month
Where they build
Permits in the last 24 months, by city.
- 7
What they build
Permits in the last 24 months, by project type.
- Commercial Building4
- Institutional Building2
- Industrial Building1
Common questions
How many building permits has J.Starr Engineering filed?
J.Starr Engineering filed 7 building permits in the last 24 months, 4 of them in the last 12 months. The most recent was filed in April 2026.
Where is J.Starr Engineering building?
By permits filed in the last 24 months, J.Starr Engineering has been most active in Edmonton (7).
What does J.Starr Engineering build?
Over the last 24 months, J.Starr Engineering's permits were mostly for Commercial Building (4), Institutional Building (2), Industrial Building (1). 7 were alterations.
How can I see J.Starr Engineering's current projects?
BuildMapper shows every permit J.Starr Engineering files on a map, with the address, project details and contacts where the city publishes them, and can alert you when they file a new one.