How to read a building permit

Filed vs. issued, declared value, permit class, and who's who on the paperwork — the fields that matter and the ones that mislead.

A permit record is a compressed story about money, timing, and people. Municipalities format them differently, but the fields below appear almost everywhere — and a few of them are routinely misread.

The fields that matter

Filed / applied date
When the application entered the system. The earliest signal — the project is real enough that someone paid a filing fee. BuildMapper ingests permits from municipal portals typically within 6–24 hours of this moment.
Issued date
When the municipality approved it. Work can legally start; mobilization is usually imminent. Trade windows run from here — and the filed→issued gap tells you how fast this municipality (and this builder) moves.
In review
Filed but not yet issued. For big projects this is the spec stage — the best possible moment for early-phase trades and suppliers to get in, before the sub list exists.
Declared / construction value
The applicant's own estimate of construction cost, declared to calculate the permit fee. Treat it as a floor, not a ceiling — it's routinely conservative since fees scale with it, and it excludes land, soft costs, and often finishes.
Permit class / type
New construction, addition, alteration/tenant improvement, or demolition — plus a use class like single-family, multifamily, or commercial. The fastest read on whether a project fits your book.
Applicant vs. owner vs. contractor
Three names that may or may not match. A contractor-as-applicant means the team is already assembled; owner-as-applicant often means subs haven't been chosen — better news for you.
Units and floors
Scale signals. Twenty units of anything is a different sale than a laneway house at any declared value — and bigger projects run longer schedules, so their trade windows stretch.

Reads by role

  • Trades: the description keywords are your fit signal — re-roof, TI, addition each imply a totally different scope. Then check the date against your trade window.
  • Suppliers: permit class + units tells you take-off size; the issue date starts the ordering clock, about two weeks ahead of the trade mobilizing.
  • Realtors: owner-builder permits and major renovations are leading indicators of a future listing — often 12–18 months out.
  • Demolition permits are the earliest possible signal of new construction on infill lots — the rebuild permit usually follows within months.
NoteOne project often means several permits — building, electrical, plumbing, sometimes development approval first. A trade permit appearing under a building permit you're tracking means the schedule is live.
Keep reading
Timing your outreach: the trade-window playbook
Field playbooks · 7 min
The first call: turning a permit into a conversation
Field playbooks · 6 min
Your first 10 minutes in BuildMapper
Product walkthroughs · 8 min

See it on your territory

Everything in this guide runs live in BuildMapper — a scored map, trade windows, Scout, and a pipeline. Free account, 25 project views, no card.